Run at Rate
Quality
Run at Rate
Production trial demonstrating that the manufacturing process can achieve required volume and quality at intended operating conditions.
Examples
- 01Before SOP, the supplier performs a run at rate for 8 hours at planned cycle time with production operators, producing 1,920 parts.
- 02The customer's engineer attends the run at rate and records output, scrap and downtime against the agreed capacity.
- 03When the run at rate reaches only 85 % of the planned output, the launch is delayed until the bottleneck station is improved.