RPN
Quality

RPN (Risk Priority Number)

Risk Priority Number

Legacy FMEA risk score calculated as Severity × Occurrence × Detection.

Examples

  1. 01In the legacy FMEA, a failure with severity 8, occurrence 4 and detection 6 has an RPN of 192, just below the action threshold of 200.
  2. 02During the supplier review, the team explains why RPN thresholds are risky: a severity 10 item can score low and never receive an action.
  3. 03When migrating to AIAG-VDA, the team re-rates every item with an RPN above 100 using the Action Priority table instead.