Process Defect Loss
Quality

Process Defect Loss

OEE quality loss caused by scrap and rework during stable production.

Examples

  1. 01On the moulding machine, 22 minutes per shift are lost to process defect loss because short shots are made and later scrapped.
  2. 02The OEE review breaks process defect loss down by product and shows that two colours cause 70 % of the scrap time.
  3. 03When process defect loss rises after a resin change, the drying time of the new material is checked and extended from 2 to 4 hours.