Backward Scheduling
Production Planning

Backward Scheduling

Scheduling backward from a required completion or delivery date to determine latest feasible start dates.

Examples

  1. 01Using backward scheduling, the planner starts from a delivery date of 20 March and calculates that machining must start by 6 March.
  2. 02When a supplier delay is announced, backward scheduling shows there is no slack left, so the order is flagged immediately.
  3. 03Backward scheduling keeps material from arriving too early, which cut WIP in the machining area by 30 %.