Skip to content
Work Element
Standardisation

Work Element

Smallest practical unit of work used to define, observe, time and improve a standardized work sequence.

Examples

  1. 01The team breaks the front-bumper assembly into 14 work elements, such as 'pick bracket' and 'fasten 4 clips'.
  2. 02Each work element is timed during observation, and an element that takes longer than standard is treated as a signal of a problem.
  3. 03After the new clip design, two work elements are merged into one, and the standard is updated so the shorter sequence becomes the baseline.

Related terms

Newsletter

One Lean idea.
Every week.