Utilization Loss

Lost productive potential caused by idle time, imbalance, waiting or unavailable work.

Examples

  1. 01On the packaging line, utilization loss of 18 % comes from operators waiting for the case packer to restart.
  2. 02The weekly review shows utilization loss by station, separating waiting for material, waiting for machines and line imbalance.
  3. 03Rebalancing the line removes most utilization loss at station 3, which was idle for 15 seconds of every 60-second takt.