Staffing Calculation
Industrial Engineering
Staffing Calculation
Calculation of required labor based on work content, takt, utilization, allowances and operating hours.
Examples
- 01The staffing calculation for the new line uses 270 seconds of work content per unit, a takt of 60 seconds and a 90 % efficiency factor, giving 5 operators.
- 02Every quarter, the staffing calculation is updated with the latest forecast and work content, so hiring and overtime decisions are based on facts.
- 03After work content is cut by 30 seconds per unit, the staffing calculation shows that one operator can move to another line.