SAT
Engineering
SAT (Site Acceptance Test)
Site Acceptance Test
Formal test of equipment after installation at the operating site.
Examples
- 01After installation in the plant, the SAT confirms the new robot cell works with local power, compressed air, safety fences and the MES.
- 02The SAT protocol is reviewed and signed by engineering, production and safety, listing each test and its result.
- 03Open SAT points, such as a missing safety signal, must be closed before the cell is released and the final payment is made.