Skip to content
Performance Rating
Industrial Engineering

Performance Rating

Assessment used in stopwatch time study to adjust observed pace to a defined standard pace.

Examples

  1. 01During a time study, the engineer gives a performance rating of 110 % because the operator works faster than the standard pace.
  2. 02The performance rating is cross-checked by two engineers on the same film to keep ratings consistent.
  3. 03Without a performance rating, a time study of a very fast operator would set a standard that others cannot reach.

Related terms

Newsletter

One Lean idea.
Every week.