Timeline showing operator and machine activity to reveal waiting and opportunities for better work combination.
Examples
- 01The man-machine chart shows that the operator waits 40 seconds during each 90-second machining cycle.
- 02The team uses the man-machine chart to check whether one operator can unload, check and load two machines within takt.