Capacity Verification
Engineering

Capacity Verification

Evidence-based demonstration that a process can meet required production volume under intended conditions.

Examples

  1. 01Capacity verification for a new welding line shows it can produce 480 frames per shift, matching the customer's peak demand.
  2. 02Before SOP, the team reviews capacity verification data from a full-shift run with production operators.
  3. 03When capacity verification reaches only 90 % of the target, the team adds a second fixture before the next gate.