Capacity Verification
Engineering
Capacity Verification
Evidence-based demonstration that a process can meet required production volume under intended conditions.
Examples
- 01Capacity verification for a new welding line shows it can produce 480 frames per shift, matching the customer's peak demand.
- 02Before SOP, the team reviews capacity verification data from a full-shift run with production operators.
- 03When capacity verification reaches only 90 % of the target, the team adds a second fixture before the next gate.