Bottleneck
Flow
Bottleneck
The process step with the lowest capacity, which limits the output of the whole system.
Examples
- 01A paint shop at 400 units per shift limits a plant that could assemble 500.
- 02WIP piles up in front of the bottleneck.
- 03Breaks are staggered so the bottleneck never stops.